103 Colmore Row – Birmingham

Eaton Electrical Ltd have recently completed the CAT B works to the 15th floor on Colmore Row Birmingham. The installation was a 12 week programme which was completed and commissioned to the customers satisfaction. These works comprised of adapting the existing lighting to allow for the installation of the new portioning walls and the supply and installation of all feature lighting to meeting rooms, break out areas and reception. All lighting is controlled via PIR detection with override switches for meeting rooms. We installed various double sockets outlets throughout the floor in partition walls these where a brushed stain chrome finish. The supply and install of two new Ac supplies which had to be pulled 90m from floor 15 to the plant deck on the 21st floor with the installation of new containment to support the cable throughout its entire run. We installed a basket containment system under the raised access floor with a divider for segregation of the power and data cabling. The main power was a busbar system below the raised access for the power all desk positions these where fed from the main power distribution in a swa cable and terminated into the busbar which was mounted on shallow strut. From there we installed double socket outlets onto the tap offs and install floor grommet for access to power and data for desks. Once the job was completed we provided a full O&M manual along with as fitted drawings.