In 2022 Eaton Electrical Ltd completed a full rewire and suspended ceiling replacement at Eureka Primary School in Swadlincote for Derbyshire County Council. The works were split over 2 phases, spanning the Easter and Summer holidays. Eaton Electrical acted as the main contractor for these works, organising a team of 10 engineers to achieve the works within the clients timescales.

These works included the following;

  • The careful isolation, disconnection and removal of the existing installation.
  • The removal and disposal of the existing ceilings.
  • The protection of floors, décor and furniture.
  • Daily site cleans.
  • Weekly Progress Reports.
  • Phased strip out and installation plan.
  • Full rewire of classrooms, offices, halls, plant/boilers rooms and outbuildings.
  • The replacement of suspended ceilings throughout.
  • Installation of new automatically controlled LED lighting throughout.
  • The installation of new car park lighting.
  • Panel Board, Distribution Board a sub main installation.
  • Provision of construction drawings.
  • Liaison with the district network operator for service alterations.
  • Inspection, testing, commissioning & certification.
  • Provision of health and safety manuals.
  • Provision of operation and maintenance manuals, including “As Fitted” drawings.

Testimonials

Headteacher, Eureka Primary School;

I am emailing to say a big thank you to Steven and to Eaton Electrical for the rewiring project.

Over the summer, the team worked hard and efficiently and were very respectful of the staff and school.

Lee communicated brilliantly and the weekly progress emails were very much appreciated.

Steven has ensured the school have been supported with the project and has liaised with Eaton, ensuring any issues / concerns were, and have been, dealt with.

Any issues were immediately raised and have been swiftly and efficiently dealt with.

The school was kept clean throughout the works and this made a very positive start back to the school year.

School looks great, all areas are lighter and brighter and look more appealing.
For me, it was a real success!